# Metso Finland Oy

Group: Metso Oyj  
Ownership path: Metso Finland Oy (company, LEI 213800KQICFL3SGQJW88) → Metso OYJ (direct parent, LEI 549300R0VN9C371W0E07)  
Country of seat: Finland  
Data as of: 2026-10-20, version 2.31  
Page: https://www.ai-waw.com/en/companies/metso-finland-oy

## Technology supplier

> A picture of the supply market – not a commercial recommendation.

- Processes at the customer: [smelting and refining](https://www.ai-waw.com/en/companies/technology/hutnictwo-rafinacja.md)
- Confirmed metals: copper, lead, nickel

- smelting and converting plant – Pori – Metso Research Center (research and testing centre for smelting technologies, pilot plants) (Pori, Finland); confirmed: copper, lead; Source [B] Company website – product page for the Kaldo furnace (metso.com), 2026-10-20 – https://www.metso.com/portfolio/kaldo-furnace/
- fire or electrolytic refining plant – Pori – Metso Research Center (research and testing centre for smelting technologies, pilot plants) (Pori, Finland); confirmed: copper; Source [B] Company website – page on the fire refining process (metso.com), 2026-10-20 – https://www.metso.com/portfolio/fire-refining-process/
- flash smelting furnace – Pori – Metso Research Center (research and testing centre for smelting technologies, pilot plants) (Pori, Finland); confirmed: copper, nickel; Source [B] Company website – product page for the flash smelting furnace (Flash Furnace) (metso.com), 2026-10-20 – https://www.metso.com/portfolio/flash-furnace/
- anode casting line (casting wheel) – Pori – Metso Research Center (research and testing centre for smelting technologies, pilot plants) (Pori, Finland); confirmed: copper; Source [B] Company website – product page for anode weighing and casting machines (metso.com), 2026-10-20 – https://www.metso.com/portfolio/anode-weighing-and-casting-machine/

### Deliveries to register plants

- Metso Finland Oy → [Pirdop – smelter and refinery (Aurubis Bulgaria AD, Pirdop)](https://www.ai-waw.com/en/companies/aurubis-bulgaria-ad#bg-aurubis-pirdop): flash smelting furnace – New cooling elements and advisory services for the flash smelting furnace rebuild at the Aurubis Bulgaria copper smelter in Pirdop. (2024); ordered; Source [B] Komunikat prasowy Metso z 12.02.2024 o przebudowie pieca zawiesinowego Aurubis Bulgaria (metso.com) – https://www.metso.com/corporate/media/news/2024/2/metso-to-deliver-cooling-solution-for-aurubis-bulgaria-flash-smelting-furnace-rebuild/
- Metso Finland Oy → [Hamburg – smelter, refinery, rolling mill (Aurubis AG, Hamburg)](https://www.ai-waw.com/en/companies/aurubis-ag#de-aurubis-hamburg): fire or electrolytic refining plant – Complete hydrogen-ready anode furnaces with hoods and auxiliary equipment for anode refining at the Aurubis plant in Hamburg; order booked in H1 2023. (2023); ordered; Source [B] Metso press release of 29.09.2023 on anode furnaces for the Aurubis smelter in Hamburg (metso.com) – https://www.metso.com/corporate/media/news/2023/9/aurubis-ag-and-metso-working-on-the-decarbonization-of-hamburg-copper-smelter/
- Metso Finland Oy → [Rönnskär – smelter (electrolysis plant being rebuilt) (Boliden Mineral AB, Skelleftehamn)](https://www.ai-waw.com/en/companies/boliden-mineral-ab#se-boliden-ronnskar): smelting and converting plant – Kaldo furnace for the expansion of the electronic scrap recycling facility at the Rönnskär smelter (capacity from 45,000 to 120,000 t/y); commissioning planned for end of 2011. (2010); ordered; Source [B] Outotec press release of 07.05.2010 on the delivery of a Kaldo furnace for Boliden (metso.com) – https://www.metso.com/corporate/media/news/2010/5/outotec-to-deliver-kaldo-furnace-technology-for-boliden-in-sweden/
- Metso Finland Oy → [O/Huta Miedzi Głogów (Głogów I and II) (KGHM Polska Miedź S.A., Głogów)](https://www.ai-waw.com/en/companies/kghm-polska-miedz-s-a#pl-hm-glogow): flash smelting furnace – Modernisation of the HM Głogów II flash smelting furnace: engineering, concentrate feeding equipment, auxiliary burners, waste heat boiler, automation and commissioning; start-up scheduled for August 2009. (2008); ordered; Source [B] Komunikat prasowy Outotec z 26.02.2008 o modernizacji huty miedzi KGHM (metso.com) – https://www.metso.com/corporate/media/news/2008/2/outotec-to-modernize-kghms-copper-smelter-in-poland/