Fact register · R03-S-SI-SCRAP-2031
Copper scrap, total (post-consumer collected and new), Slovenia, 2031 (forecast; 80% interval)
12.90 tys. t Cu
SI · 2031 · Cu copper
80% interval: 8.10 – 21.60 tys. t Cu (10th and 90th percentile of the forecast distribution)
Note: Median (p50) of 10,000 draws; 80% interval (10th–90th percentile).
How to cite this number
ai-waw.com, AIWAW-2026-R03 v1.1, fact R03-S-SI-SCRAP-2031 – https://www.ai-waw.com/prognozy/rynek-zlomu-miedzi-ue-2026-2031