Forecasts · AIWAW-2026-R02

Methodological noteCopper semi-finished products output in the EU 2026–2031

Full description of the hybrid model of EU copper semis output: demand of four sectors, trade model (imports, exports, competition), plant model (capacity, projects, closures), combination into output by country and product with physical constraints, copper balance check, scenarios, backtest, interval calibration, limitations.

← Forecast: Copper semi-finished products output in the EU 2026–2031 Portal method → .md

The forecast is analytical and informational; it does not constitute investment advice or a financial recommendation. Values are uncertain as described by the intervals and in the method section.

Forecast model flow
Forecast model flowDiagram: successive computation stages from source data to the publication of the forecast. Semis demand forecast – construction, energy, industry, transport (IWCC end uses × Eurostat indicators, GDP and investment per IMF and EC → sector × product matrix) → Foreign trade model – imports, exports, competition (Comext CN 7407–7411 → IWCC products, partner GDP per IMF, US tariff, non-EU supplier shares) ∥ Production plant model – capacity, investment, closures (plant register, company reports, ICSG; foil separately; project probability and delay) → Output forecast by country and product – physical constraints (capacity, company lower bounds), copper balance (check: R01, cathodes, scrap) and probabilistic scenarios (Monte Carlo, 2026 nowcast, model ensemble, calibration of the final distribution)1. Semis demand forecastConstruction, energy, industry, transport (IWCC end uses × Eurostat indicators, GDP and investment per IMFand EC → sector × product matrix)2a. Foreign trade modelImports, exports, competition (Comext CN 7407–7411→ IWCC products, partner GDP per IMF, US tariff,non-EU supplier shares)2b. Production plant modelCapacity, investment, closures (plant register,company reports, ICSG; foil separately; projectprobability and delay)3. Output forecast by country and productPhysical constraints (capacity, company lower bounds), copper balance (check: R01, cathodes, scrap) andprobabilistic scenarios (Monte Carlo, 2026 nowcast, model ensemble, calibration of the final distribution)Forecast model flowDiagram: successive computation stages from source data to the publication of the forecast. Semis demand forecast – construction, energy, industry, transport (IWCC end uses × Eurostat indicators, GDP and investment per IMF and EC → sector × product matrix) → Foreign trade model – imports, exports, competition (Comext CN 7407–7411 → IWCC products, partner GDP per IMF, US tariff, non-EU supplier shares) ∥ Production plant model – capacity, investment, closures (plant register, company reports, ICSG; foil separately; project probability and delay) → Output forecast by country and product – physical constraints (capacity, company lower bounds), copper balance (check: R01, cathodes, scrap) and probabilistic scenarios (Monte Carlo, 2026 nowcast, model ensemble, calibration of the final distribution)1. Semis demand forecastConstruction, energy, industry, transport (IWCC enduses × Eurostat indicators, GDP and investment perIMF and EC → sector × product matrix)2a. Foreign trade modelImports, exports, competition (Comext CN7407–7411 → IWCC products, partner GDP per IMF,US tariff, non-EU supplier shares)2b. Production plant modelCapacity, investment, closures (plant register,company reports, ICSG; foil separately; projectprobability and delay)∥ parallel modules3. Output forecast by country and productPhysical constraints (capacity, company lowerbounds), copper balance (check: R01, cathodes,scrap) and probabilistic scenarios (Monte Carlo,2026 nowcast, model ensemble, calibration of thefinal distribution)
  1. Semis demand forecast – construction, energy, industry, transport (IWCC end uses × Eurostat indicators, GDP and investment per IMF and EC → sector × product matrix)
  2. Foreign trade model – imports, exports, competition (Comext CN 7407–7411 → IWCC products, partner GDP per IMF, US tariff, non-EU supplier shares) ∥ Production plant model – capacity, investment, closures (plant register, company reports, ICSG; foil separately; project probability and delay)
  3. Output forecast by country and product – physical constraints (capacity, company lower bounds), copper balance (check: R01, cathodes, scrap) and probabilistic scenarios (Monte Carlo, 2026 nowcast, model ensemble, calibration of the final distribution)

Methodological note – Copper semi-finished products output in the EU 2026–2031

ai-waw.com · version 2.0 · 2026-10-17 · AIWAW-2026-R02

Contents: 1 · 2 · 3 · 4 · 5 · 6 · 7 · 8 · 9 · 10 · 11 · 12 · 13 · 14 · 15 · 16

1. Method summary and hybrid model diagram

Version 2.0 replaces the version 1.x bottom-up model (output = EU use / (1 − net export share), country shares as random walks, capacity outside the model) with a three-layer hybrid model: 1) the semis demand forecast in four customer sectors – construction, energy and grids, industry and transport; 2) two parallel modules – the foreign trade model (imports, exports, competition) and the production plant model (capacity, investment, closures); 3) the output forecast by country and product with physical constraints, a copper balance check and probabilistic scenarios. Levels are anchored in International Wrought Copper Council (IWCC) data for the EU-27 (EU27+UK net of the United Kingdom).

The 2027–2031 EU-27 level is set by an equal-weight ensemble of five models (the hybrid model and four statistical models); the hybrid model gives the split by country and product, the distribution (intervals) and the scenarios.

Result: EU-27 copper and alloy semis (excluding wire rod) in 2031 – median 3,946 kt (80% interval 3,293–4,706; 2025: 3,886 kt), +0.3% a year on average; wire rod – 2,342 kt (+0.4% a year).

Model diagram (arrows – direction of information flow; modules in one step run in parallel on the same draws):

  1. Semis demand forecast – construction, energy, industry, transport (IWCC end uses × Eurostat indicators, GDP and investment per IMF and EC → sector × product matrix) ↓
  2. Parallel modules: [a] Foreign trade model – imports, exports, competition (Comext CN 7407–7411 → IWCC products, partner GDP per IMF, US tariff, non-EU supplier shares) ∥ [b] Production plant model – capacity, investment, closures (plant register, company reports, ICSG; foil separately; project probability and delay) ↓
  3. Output forecast by country and product – physical constraints (capacity, company lower bounds), copper balance (check: R01, cathodes, scrap) and probabilistic scenarios (Monte Carlo, 2026 nowcast, model ensemble, calibration of the final distribution)

Each Monte Carlo draw passes through all layers; named scenarios use the same random numbers (common random numbers), so the difference against the base in a given draw results only from the parameter change.

2. Scope, definitions, data and symbols

Table 1. IWCC products (forecast stages)
Stage Name IWCC Form (plant module)
semis.wire_rod Copper wire rod (intermediate for wire drawing; outside the semis total) Copper Wire Rod wire rod
semis.copper.wire Copper wire (all drawn wire, incl. cable makers) Copper Wire wire
semis.copper.bars_profiles Copper rods, bars and sections Copper Rods, Bars & Sections bars and profiles
semis.copper.sheet_strip Copper plate, sheet and strip (incl. foil) Copper Plate, Sheet & Strip (Inc. Foil) rolled sheet and strip + foil
semis.copper.tubes Copper tubes Copper Tube tubes
semis.alloy.wire Copper-alloy wire Alloy Wire wire
semis.alloy.bars_profiles Alloy rods, bars and sections Alloy Rods, Bars & Sections bars and profiles
semis.alloy.sheet_strip Alloy plate, sheet and strip Alloy Plate, Sheet & Strip rolled sheet and strip
semis.alloy.tubes Alloy tubes Alloy Tube tubes

Total semis (semis) = copper semis + alloy semis per IWCC, excluding wire rod; wire rod (semis.wire_rod) is the intermediate for wire and is not added to semis. Unit – kt of product mass; Cu content – @kt_cu series. Areas: EU-27, countries with significant sold output (≥ 40 kt of semis or wire rod on average in 2020–2024) and “other EU countries and unallocated output” (REST_EU27). History 2012–2025, nowcast 2026, forecast 2027–2031.

Foil: the IWCC product “Copper Plate, Sheet & Strip (Inc. Foil)” includes foil by name, and IWCC lists heading 7410 – copper foil regardless of technology – among copper and alloy tariff codes (IWCC statistics page). The code list is, however, general (it also includes matte, scrap and powders) and does not define the product scope, and IWCC does not mention electrodeposited foil explicitly. Including electrodeposited foil in the anchor is therefore an ASSUMPTION (class C): it is treated as part of the anchor (also in CN 7410 imports and in projects), and in the plant module as a separate sub-form, so that new foil plants do not displace rolled strip. Sensitivity: without EU foil projects (SK Nexilis, Volta) EU-27 copper plate, sheet, strip and foil in 2031 would be lower by about 26 kt on average (about 8% of the product, about 0.65% of total semis; Poland −9, other countries −17 kt).

Table 2. Hybrid model input data
Source Use Class
IWCC Semis Production and Demand 2012–2025; End Use Summary product output and use, end-use structure B
Eurostat PRODCOM countries, United Kingdom share, foil A
Eurostat Comext DS-045409 extra-EU imports and exports CN 7403, 7404, 7407–7411 (CN6, CN8), all downloaded partners A
Eurostat sts_copr, sts_inpr (F, F41, F42, F43, C, C26, C27, C271, C2732, C28, C29, C30) customer sector indices, recession scenario A
Eurostat nama_10_gdp EU GDP and gross fixed capital formation A
IMF, World Economic Outlook Oct 2026 GDP of the EU and trade partners B
EC, European Economic Forecast – Spring 2026 EU investment 2026–2027 B
EC, COM(2023) 757 (EU Action Plan for Grids) grid scenario context A
ICSG Directory (XII 2020) capacity of the EU-27+UK+NO+CH region by form B
Company reports and releases, plant register, EUR-Lex, Federal Register capacity, output, projects, closures; trade measures A–C
Eurostat nrg_pc_205 industrial electricity prices (scenario) A
ai-waw.com R01 forecast (EU-27 refined copper) copper balance check –
Table 3. Symbols
Symbol Meaning Chapter
P, D, M, X, R output, use, extra-EU imports and exports, IWCC–Comext reconciliation residual (kt) 3, 5, 7
p, f, a, t IWCC product, plant-module form, area, year 2
s, Ss,t sector, sector index 4
wp,s share of sector s in product p Cu use 4
θ, κD “Electrical” share in energy; Dirichlet concentration of the matrix 4
β, αp, λ demand elasticity to sectors, own product trend, damping 4
φp, σA,p, σv,p autocorrelation and standard deviations of use shocks 4
mp,t, η, cpX import penetration, export elasticity, export trend 5
ρp, R̄p autocorrelation and mean of the reconciliation residual 5
Ca,f,t, upeak, umax capacity, peak-year utilisation, maximum utilisation 6
ϑ, ψ, Q, L share of new output replacing imports, share of a closed plant's output taken over in the EU, new output, loss 6, 7
πa,f,t, ζa,t area share in a form, share shock 7
φGB, ωp EU share of supplies to the United Kingdom, share of product p in form f (IWCC 2025) 3
c, sd0 conformal multiplier, hybrid model spread 10
At, κCu metal availability in the EU, Cu content of scrap 11

3. IWCC anchor and removal of the United Kingdom

EU-27 output and use of product p are derived from IWCC data for the EU27+UK region net of the United Kingdom: output – the UK share of form output per PRODCOM (EU28 − EU-27, 2015–2019; EU28 values are rounded Eurostat estimates); use – UK output plus EU-27→GB net shipments (Comext) divided by the EU supply share φGB (assumption 0.70, range 0.55–0.85). The UK share uncertainty is drawn in every draw.

Pp,t = Pp,tIWCC · (1 − sfUK), Dp,t = Dp,tIWCC − ωp · (sfUK · Pf,tIWCC + NfUE→GB / φGB)

ωp – share of product p in form f per IWCC 2025.

4. Module 1 – semis demand in four sectors

IWCC copper end uses (End Use Summary, Cu content, world 2012–2025) are allocated to four sectors by IWCC group and category description. “Electrical” (industrial transformers and motors) is split: share θ – energy, the rest – industry; θ ~ U(0.25; 0.55). Cooling and air conditioning (equipment) belong to industry, air-conditioning tube in buildings – to construction. Construction is measured by buildings (F41) and specialised works (F43) – building installations – while civil engineering (F42, incl. networks) enters the energy index; F41 and F43 are published from 2015, before that the construction index is total F.

Table 4. Allocation of IWCC end uses to sectors
IWCC end use IWCC description Sector Share Eurostat indicator (NACE) Share of world Cu 2025
Plumbing Water distrib., heating, gas, sprinkler construction 1 F41, F43 (to 2015 – F) 3.7%
Building Plant Aircon tube construction 1 F41, F43 (to 2015 – F) 0.8%
Architecture Roofs, gutters, flashing, decor., builders h/w construction 1 F41, F43 (to 2015 – F) 0.8%
Communications Comms wiring in buildings construction 1 F41, F43 (to 2015 – F) 0.7%
Electrical Power Power distrib., earth, ground, light, wire device construction 1 F41, F43 (to 2015 – F) 17.5%
Power Utility Utility transm. and distribution network energy and grids 1 C271, C2732, F42 15.6%
Telecommunications Telecom network energy and grids 1 C2732 2.8%
Electrical Industrial transformers & motors energy and grids 0.40 C271 6.2%
Electrical Industrial transformers & motors industry 0.60 C27 6.2%
Non Electrical Valves, fittings, instruments and in plant equipment industry 1 C28 5.0%
Automotive Electrical Harnesses, motors and Li-Ion batteries transport 1 C29 11.2%
Automotive Non Electrical Radiators and tubing transport 1 C29 0.7%
Other Vehicles Railroad, shipping and marine transport 1 C30 4.1%
Consumer and general products Appliances, instruments, tools and other industry 1 C 8.2%
Cooling equipment Aircon and refrigeration industry 1 C28 8.8%
Electronic equipment Industrial/ commercial electronics and PCs industry 1 C26 5.0%
Diverse Others industry 1 C 9.0%

The sector s index is the average of log changes of end-use indicators weighted by their Cu content (world 2025):

Δln Ss,t = Σe∈s ve · Δln Ie,t, ve = Cue,2025 · ue / Σe'∈s Cue',2025 · ue'

Sector forecast: 2026 – ratio of the averages of the available months of 2026 and the same months of 2025 (seasonally adjusted), with standard deviation σs · √((12 − m)/12) for m observed months; 2027–2031 – regression of the index change on a macroeconomic driver x (EU GDP for energy and transport, EU gross fixed capital formation for construction and industry), OLS 2011–2025. The driver is drawn around the forecast (uncertainty from historical volatility, class C):

Δln Ss,t = as + bs · xs,t + es,t, et ~ N(0, Ω), xs,t = x̂s,t + σx εx,t

Ω – covariance matrix of sector residuals (correlations from 2011–2025). Driver uncertainty: GDP σ = 1.16 pp, GFCF σ = 2.76 pp, correlation 0.67 (2011–2025 excluding 2020–2021) – IMF and EC forecast error statistics are not in the forecast data. GDP comes from the IMF October 2026 release and investment 2026–2027 from the EC Spring 2026 forecast (the latest releases at the forecast date); then a bridge through a regression of investment on GDP.

Table 5. Macroeconomic drivers of the sector forecast (Δln, %)
Year EU GDP (IMF) EU GFCF (EC / bridge)
2026 1.38 2.18
2027 1.41 1.98
2028 1.50 1.86
2029 1.42 1.78
2030 1.35 1.71
2031 1.33 1.69
Table 6. Sectors: regression (4.2) parameters and index forecast
Sector a b σ Δln 2015–2025 (avg., %) 2026 (available months, %) Change 2025→2031, % (p50, p10…p90)
construction −0.0121 0.74 0.017 +0.60 −3.6 −3.0 (−10.7 … +5.4)
energy and grids −0.0130 1.18 0.027 +0.89 +2.8 +4.5 (−5.6 … +15.7)
industry −0.0045 1.04 0.037 +1.43 +2.0 +9.3 (−6.2 … +27.3)
transport −0.0169 1.88 0.057 +0.04 −0.1 +4.4 (−14.6 … +28.0)

The sector × product matrix is built from a prior end use × product matrix (product shares in the end use's Cu – an assumption from IWCC category descriptions, e.g. “Aircon tube” → copper tube, “Water distrib., heating” → copper tube and brass fittings), multiplied by the IWCC end-use structure and column-scaled to the 2025 Cu use of IWCC EU-27 products. Columns are sector shares in product use wp,s; wire rod takes the copper wire weights. In each draw the weights are perturbed by a Dirichlet distribution (κD = 50) and shifted with the drawn θ.

Table 7. Sector × product matrix wp,s (sector share in EU-27 product Cu use, 2025)
Product construction energy and grids industry transport
Copper wire rod (intermediate for wire drawing; outside the semis total) 0.276 0.298 0.244 0.182
Copper wire (all drawn wire, incl. cable makers) 0.276 0.298 0.244 0.182
Copper rods, bars and sections 0.204 0.484 0.219 0.092
Copper plate, sheet and strip (incl. foil) 0.059 0.203 0.407 0.331
Copper tubes 0.263 0.000 0.726 0.011
Copper-alloy wire 0.000 0.088 0.912 0.000
Alloy rods, bars and sections 0.226 0.008 0.697 0.069
Alloy plate, sheet and strip 0.160 0.012 0.615 0.213
Alloy tubes 0.115 0.000 0.581 0.304

Implied sector structure of EU-27 Cu use: construction 23.6%, energy and grids 21.0%, industry 39.0%, transport 16.4% – practically the same as the global one (IWCC does not publish the EU structure). The construction share in tubes and brass in the EU is probably higher (water and heating installations, fittings) – a limitation described in chapter 15.

Product use in the EU-27 (IWCC, net of UK) responds to the product's sector index. The elasticity β is common (DerSimonian–Laird estimator for 8 products; wire rod duplicates copper wire – same sector weights, use correlation 0.99 – and takes the common β), and the own trend αp is shrunk to a common mean with the same estimator and damped by half (λ = 0.5). The (β, ᾱ) distribution in the draws comes from a block bootstrap of years (3-year blocks, 2,000 replications, the same years for all products), because the product estimates are not independent:

Δln Ŝp,t = Σs wp,s Δln Ss,t; Δln Dp,t = λ ᾱ(b) + β(b) Δln Ŝp,t + up,t
up,t = φp up,t−1 + σA,p εp,t, or local level: ln D̃ = ln D + σv,p vt, σv,p² = min(−Cov(Δyt, Δyt−1); 0,45 γ0)

The local level is chosen when the autocorrelation of use changes is negative (a sign of measurement noise in IWCC data); the start then comes from a Kalman filter, otherwise from 2025. The DerSimonian–Laird estimator gives τ² = 0 (the Q test shows no heterogeneity), so β and α are common to all products; product differences come from the sector matrix, trade and the shocks up,t.

Table 8. Identification of elasticities β (demand) and η (exports): variants
Variant β η
Full sample, DerSimonian–Laird (se) 0.873 (0.187) 1.275 (0.337)
Block bootstrap of years: median (5–95%) 0.90 (0.05–1.36) 1.36 (−0.62–2.06)
Bootstrap: standard deviation 0.461 0.770
Excluding 2020–2021 0.269 (0.268) 0.975
Robust estimation (Huber, panel with product effects) 0.854 (0.191) –

β is identified mainly by the 2020–2021 fall and rebound; without those years the elasticity is clearly lower. Robust estimation confirms the full-sample value, and the wide bootstrap distribution carries this uncertainty into the draws and scenarios (chapter 12).

Table 9. Product demand: parameters
Product OLS β̂ (se) OLS α̂ shrunk α σA σv φ
Copper wire rod (intermediate for wire drawing; outside the semis total) 1.03 (0.43) −0.0051 −0.0051 0.040 0.030 0.00
Copper wire (all drawn wire, incl. cable makers) 1.13 (0.43) −0.0032 −0.0051 0.045 0.027 0.00
Copper rods, bars and sections 1.35 (0.78) 0.0137 −0.0051 0.101 0.009 0.00
Copper plate, sheet and strip (incl. foil) 0.44 (0.60) 0.0121 −0.0051 0.099 0.000 0.30
Copper tubes 0.82 (0.35) −0.0128 −0.0051 0.049 0.000 0.10
Copper-alloy wire 0.45 (0.66) −0.0101 −0.0051 0.035 0.073 0.00
Alloy rods, bars and sections 0.84 (0.48) −0.0135 −0.0051 0.064 0.020 0.00
Alloy plate, sheet and strip 0.92 (0.86) 0.0142 −0.0051 0.124 0.034 0.00
Alloy tubes 1.06 (0.62) −0.0048 −0.0051 0.067 0.053 0.00

5. Module 2a – foreign trade: imports, exports, competition

Extra-EU imports and exports (Comext DS-045409, mass) are converted to IWCC products with an explicit CN6 → product key; code 7408 11 (wire with a cross-section > 6 mm) is wire rod, foil (7410) belongs to plate, sheet and strip. The key is reconciled with history: the difference between IWCC (P − D) and Comext (X − M) net exports is the reconciliation residual R (stocks, captive output, classification mismatch, United Kingdom trade; for copper wire – cable trade outside chapter 74).

Table 10. CN6 → IWCC product key
IWCC product CN6
Copper wire rod (intermediate for wire drawing; outside the semis total) 740811
Copper wire (all drawn wire, incl. cable makers) 740819
Copper rods, bars and sections 740710
Copper plate, sheet and strip (incl. foil) 740911, 740919, 741011, 741012
Copper tubes 741110
Copper-alloy wire 740821, 740822, 740829
Alloy rods, bars and sections 740721, 740729
Alloy plate, sheet and strip 740921, 740929, 740931, 740939, 740940, 740990, 741021, 741022
Alloy tubes 741121, 741122, 741129
Table 11. IWCC and Comext reconciliation, 2025 (kt)
Product IWCC output IWCC use Import Export IWCC net exports Comext net exports R
Copper wire rod (intermediate for wire drawing; outside the semis total) 2,282 1,978 44.8 318.8 303.5 273.9 29.6
Copper wire (all drawn wire, incl. cable makers) 1,954 2,039 41.3 25.0 −84.6 −16.3 −68.3
Copper rods, bars and sections 150 113 11.1 42.1 36.7 31.0 5.7
Copper plate, sheet and strip (incl. foil) 298 282 43.5 78.8 16.2 35.3 −19.2
Copper tubes 249 255 53.1 62.5 −5.9 9.4 −15.3
Copper-alloy wire 35 60 16.2 10.7 −24.8 −5.5 −19.2
Alloy rods, bars and sections 825 742 23.5 102.7 83.4 79.2 4.1
Alloy plate, sheet and strip 310 282 39.4 64.2 28.5 24.9 3.6
Alloy tubes 64 77 10.7 11.1 −13.2 0.4 −13.6

Imports are import penetration m = M/D on a logit scale (m ∈ (0; 1)) with a drift (10-year average, damped by half) and a shock; exports grow with external demand – partner GDP (IMF) weighted by the product's 2023–2025 extra-EU export structure – with elasticity η (DerSimonian–Laird; distribution from a block bootstrap of years) and a damped trend cpX; the reconciliation residual reverts to its 5-year mean as an AR(1) process with product-specific parameters:

Mp,t = mp,t Dp,t, logit mp,t = logit mp,t−1 + λ · mean10(Δlogit mp) + σm,p εt
Δln Xp,t = cpX + η (Δln Yp,t* − mean Δln Yp*) + σX,p εt, Δln Yp,t* = Σk ωp,k Δln GDPk,t
Rp,t = R̄p + ρp (Rp,t−1 − R̄p) + σR,p εt

The 50% US tariff on semi-finished copper products (Proclamation 10962, from 1 Aug 2025) enters as a permanent reduction of the export level to the USA: r – exports to the USA in the available months of 2026 vs the same months of 2025 (Comext); since 2025 already contains 5 months after the tariff, the 2026 level changes by 1 − wUS + wUS · r / (7/12 + 5/12 · r), where wUS is the US share of the product's 2023–2025 extra-EU exports.

Table 12. Trade: product parameters
Product logit m drift σm Export trend cX (%/yr) σX R̄ ρ σR USA: r; wUS
Copper wire rod (intermediate for wire drawing; outside the semis total) +0.063 0.282 +0.88 0.075 28.1 0.11 39.8 3.07; 0.01
Copper wire (all drawn wire, incl. cable makers) +0.024 0.103 −0.28 0.104 −85.8 0.69 20.6 0.86; 0.05
Copper rods, bars and sections +0.029 0.188 +0.09 0.061 2.1 0.44 4.3 0.51; 0.24
Copper plate, sheet and strip (incl. foil) +0.077 0.242 −2.17 0.072 −9.0 0.64 10.0 0.62; 0.33
Copper tubes +0.050 0.110 −0.05 0.065 −11.4 0.74 5.7 0.95; 0.21
Copper-alloy wire +0.006 0.162 −1.12 0.315 −14.0 0.18 7.2 0.86; 0.18
Alloy rods, bars and sections +0.015 0.177 +0.72 0.065 8.5 0.86 6.4 0.51; 0.09
Alloy plate, sheet and strip +0.011 0.129 −1.69 0.148 4.7 0.80 6.0 0.62; 0.26
Alloy tubes +0.007 0.137 −1.77 0.110 −10.1 0.87 4.4 0.95; 0.21
Table 13. Competition: main non-EU suppliers – all downloaded partners (share of extra-EU imports 2023–2025; 2015–2017 in brackets)
Form Imports, kt/yr Suppliers
bars and profiles 31.4 Türkiye 44.5% (43.1%); China 15.4% (7.2%); United Kingdom 7.3% (9.4%); Ukraine 6.9% (2.6%); Korea, Rep. 5.3% (3.0%); Serbia 4.0% (4.9%)
sheet and strip (incl. foil) 92.4 Türkiye 21.4% (24.9%); Korea, Rep. 17.4% (8.2%); China 17.2% (14.5%); Serbia 11.2% (13.6%); United Kingdom 11.1% (19.8%); Malaysia 7.3% (0.2%)
tubes 60.2 China 28.0% (21.3%); Vietnam 25.5% (2.8%); Mexico 14.6% (12.2%); Türkiye 10.7% (5.9%); United Kingdom 6.9% (24.7%); Serbia 2.8% (11.3%)
wire (copper and alloys) 55.7 Türkiye 62.7% (61.3%); Vietnam 11.7% (0.2%); Uzbekistan 5.3% (0.1%); China 4.8% (9.9%); Peru 3.3% (4.0%); Japan 2.4% (1.4%)
wire rod 35.6 Türkiye 56.1% (27.9%); Egypt 27.9% (6.1%); Canada 4.3% (0.0%); North Macedonia 4.0% (0.0%); Serbia 1.8% (2.8%); Malaysia 0.4% (0.0%)
Table 14. Extra-EU imports by CN8 subheading – top 10 (kt/yr)
CN8 IWCC product 2015–2017 2023–2025 Change
74111090 Copper tubes 13.9 38.3 175.4%
74081100 Copper wire rod (intermediate for wire drawing; outside the semis total) 18.2 35.6 95.5%
74091100 Copper plate, sheet and strip (incl. foil) 4.3 23.5 444.7%
74101100 Copper plate, sheet and strip (incl. foil) 1.5 21.5 1,326.2%
74092100 Alloy plate, sheet and strip 7.6 20.3 164.8%
74081990 Copper wire (all drawn wire, incl. cable makers) 15.7 20.1 28.3%
74081910 Copper wire (all drawn wire, incl. cable makers) 12.6 20.0 58.0%
74072110 Alloy rods, bars and sections 14.6 13.6 −6.8%
74111010 Copper tubes 10.8 11.3 4.5%
74082100 Copper-alloy wire 10.2 10.7 5.4%

CN8 subheadings show that imports grow unevenly within families (e.g. coiled vs straight tubes, foil, fine wire); the model works at the IWCC product level, so this structure is context. EU trade defence – as a legal fact: the anti-dumping proceeding on copper tubes from China, Mexico, Vietnam and Uzbekistan (OJ C/2026/1506, 12 Mar 2026) with import registration (Implementing Regulation 2026/1161). No duty rates had been published by the forecast date, so a duty variant cannot be parameterised from EUR-Lex documents – the base makes no assumption on the outcome (version 2.1). CBAM does not cover chapter 74 (Regulation 2023/956).

6. Module 2b – production plants: capacity, investment, closures

Plant-module forms: wire rod, wire, bars and profiles, rolled sheet and strip, foil, tubes. Foil (national PRODCOM 24.44.25; the rest of the EU in the “other” item) is separated from “copper.sheet_strip” with its 2025 share (13.0%), changed only by foil projects. Capacity of area a in form f: the documented value when the plant register gives the capacity of all the area's plants in the form and it is not below output; otherwise a lower bound – maximum 2021–2025 output divided by the peak-year utilisation (class C). For wire rod in Poland (the KGHM Polska Miedź S.A. plant in Orsk) the company report gives “about 270 kt a year” as an output level, not capacity – so the general rule applies (2021–2025 maximum: 271.0 kt in 2024); company documents announce higher output at Orsk (a new Contirod line, Upcast II) without quantities, so they have no quantitative term. The “other” item has capacity not below the remainder of ICSG regional capacity (Dec 2020) net of the United Kingdom, Norway and Switzerland shares.

Ca,f,t = max2021–2025 Pa,f / min(ua,fpeak; umax) + Σj∈a,f ΔCj rj,t, upeak ~ U(0.65; 1.00)
CREST,f,t ≥ Cf,2020ICSG · (1 − sfUK − sNO,CH) − Σa≠REST Ca,f,t, sNO,CH ~ U(0.01; 0.05)
Pa,f,t ≤ umax · Ca,f,t, umax ~ U(0.95; 1.00), umax · Ca,f,t ≥ max2021–2025 Pa,f
Table 15. Volume-to-capacity ratio in company data (same plant and year)
Plant Form Capacity, kt Volume measure Volume, kt Year Ratio
Sofia Med (Sofia) rolled sheet and strip 145.0 sales 95.2 2025 0.66
Elcowire (Hettstedt) wire 30.0 deliveries 27.3 2025 0.91
HME Brass Germany (Berlin) bars and profiles 95.0 output 38.0 2025 0.40
HME Copper Germany (Menden) tubes 50.0 output 33.5 2025 0.67
HME Ibertubos (Santa Perpètua de Mogoda) tubes 2.0 output 1.0 2025 0.51
HME Brass France (Rai) bars and profiles 80.0 output 27.5 2025 0.34
HME Brass Italy (Serravalle Scrivia) bars and profiles 105.0 output 56.8 2025 0.54

Maximum utilisation umax and peak-year utilisation upeak are class C assumptions: the available company data (table above, including sales and deliveries instead of output) give ratios of 0.34–0.91 and do not measure full-load utilisation; the ratio of IWCC 2020 output to ICSG Dec 2020 capacity is 0.5–0.8 depending on the form. Condition (6.3) ensures that capacity is not below the output achieved in 2021–2025.

Projects, closures and relocations (primary company documents; parameters – class C assumptions): start with probability p, delay ~ Poisson (mean 1 year under construction, 2 years planned), ramp-up 50% in the start year and 100% from the next year; when the documented date has passed without confirmation – start in 2027 at the earliest. New output Q = ΔC · r · unew fully raises EU output: a share ϑ ~ U(0.3; 0.7) replaces imports (at most half of the product's imports), the rest raises exports – existing EU plants are not displaced. After a closure a share ψ of output is taken over by other EU plants (by default ψ ~ U(0.3; 0.8)), the rest goes to imports. A relocation only changes the split between countries.

rj,t = min(1; max(0; (t − Tj + 1)/2)), Tj = max(Tjdoc; Tmin) + dj, dj ~ Poisson(δstatus), P(start) = pj
Table 16. Events in the plant module
Event Country Form Type kt Year (doc.) p Utilisation ψ In EU
KME Stolberg DE rolled sheet and strip closure 6.9 2025 1.00 – 1.0 yes
HME Brass France, Rai FR bars and profiles relocation 13.8–27.5 2026 0.90 – 0.3–0.8 yes
Nexans, Lens FR wire rod project 0.0–85.0 2027 0.85 0.5–0.9 – yes
Volta Energy Solutions, Környe (plant 3) HU foil project 62.0 2028 0.50 0.5–0.9 – yes
Hailiang, Tangier – tubes MA tubes project 35.0 2027 0.50 0.5–0.9 – no (import scenario)
Hailiang, Tangier – rods MA bars and profiles project 40.0 2029 0.50 0.5–0.9 – no (import scenario)
Hailiang, Tangier – foil MA foil project 25.0 2029 0.50 0.5–0.9 – no (import scenario)
SK Nexilis, Stalowa Wola PL foil project 50.0 2024 0.50 0.2–0.5 – yes
CRW Metal (Sarkuysan), Türkiye TR wire rod project 250.0 2027 0.85 0.6–0.9 – no (import scenario)

Rationale for event parameters: SK Nexilis (Stalowa Wola) – plant completed without a confirmed start-up, and the anchor customer (Northvolt, about 80% of offtake per the SKC release) filed for bankruptcy on 12 Mar 2025 – p = 0.5 and utilisation 0.2–0.5. Rai – Hailiang board resolution of 3 Aug 2026 and the job-protection plan agreement: relocation of solid brass rod capacity to Germany and Italy, p = 0.9; scope – part of the 27.5 kt output (solid rod share not stated). KME Stolberg – portfolio transferred to other KME plants, ψ = 1. Nexans Lens – wire rod increase U(0; 85 kt): upper bound = “over +50%” (release of 22 Oct 2024) × 170 kt capacity (plant page); the line mainly remelts scrap instead of cathodes, so the volume increase is uncertain. Projects without quantities in documents (modernisations, electrorefining in Córdoba) have no quantitative term; items on the forecast exclusion list were removed from the register and events.

Table 17. Area capacity: lower bound and source (kt)
Area Form Max 2021–2025 2025 Register Lower bound Class
Germany wire rod 647.0 647.0 150.0* 647.0 C
Spain wire rod 316.2 224.5 – 316.2 C
Finland wire rod 2.0 1.0 – 2.0 C
Italy wire rod 415.6 415.6 – 415.6 C
Poland wire rod 271.0 262.1 270.0* 271.0 C
Sweden wire rod 183.6 124.9 150.0 183.6 C
Other EU countries and unallocated output wire rod 754.7 606.7 – 754.7 C
Germany wire 102.6 102.6 30.0* 102.6 C
Spain wire 103.1 103.1 – 103.1 C
Finland wire 1.1 0.6 – 1.1 C
France wire 0.6 0.3 65.0* 0.6 C
Italy wire 199.1 151.5 – 199.1 C
Poland wire 17.8 17.8 18.0* 17.8 C
Sweden wire 22.1 2.2 – 22.1 C
Other EU countries and unallocated output wire 1,793.3 1,611.7 – 1,793.3 C
Germany bars and profiles 255.2 187.1 245.0* 255.2 C
Spain bars and profiles 85.7 85.7 – 85.7 C
Finland bars and profiles 8.3 7.8 – 8.3 C
France bars and profiles 91.0 82.1 128.0* 91.0 C
Greece bars and profiles 24.4 15.9 40.0 40.0 B
Italy bars and profiles 573.2 425.4 105.0* 573.2 C
Poland bars and profiles 28.2 24.4 – 28.2 C
Sweden bars and profiles 20.5 12.0 75.0 75.0 C
Other EU countries and unallocated output bars and profiles 146.1 134.4 – 146.1 C
Germany rolled sheet and strip 582.6 410.4 – 582.6 C
Finland rolled sheet and strip 55.3 50.3 – 55.3 C
France rolled sheet and strip 19.8 8.5 – 19.8 C
Italy rolled sheet and strip 81.3 54.9 – 81.3 C
Poland rolled sheet and strip 3.4 2.1 – 3.4 C
Other EU countries and unallocated output rolled sheet and strip 74.8 43.1 – 74.8 C
Germany foil 7.3 4.3 – 7.3 C
Italy foil 10.9 10.9 – 10.9 C
Sweden foil 0.3 0.3 – 0.3 C
Other EU countries and unallocated output foil 29.9 23.3 – 29.9 C
Germany tubes 155.7 121.9 50.0* 155.7 C
Spain tubes 18.7 12.9 2.0* 18.7 C
Finland tubes 14.0 11.4 – 14.0 C
France tubes 2.4 0.4 – 2.4 C
Greece tubes 78.7 65.4 81.2* 78.7 C
Italy tubes 114.6 89.0 – 114.6 C
Poland tubes 10.0 4.5 – 10.0 C
Sweden tubes 0.5 0.4 – 0.5 C
Other EU countries and unallocated output tubes 11.2 7.2 – 11.2 C
Table 18. EU-27 capacity by form: model (p50, 2031) and ICSG (Dec 2020, EU-27+UK+NO+CH region) (kt)
Form Model p50 2031 ICSG 2020 Utilisation p50 2031
wire rod 3,224.2 2,835.7 0.73
wire 2,721.7 225.9 0.73
bars and profiles 1,743.3 1,800.9 0.56
rolled sheet and strip 994.7 999.0 0.54
foil 110.3 – 0.55
tubes 616.8 694.1 0.48

Wire: ICSG covers only alloy wire in the region including the United Kingdom, Norway and Switzerland, without copper wire drawing at cable makers, while the model capacity covers all EU-27 wire (a lower bound from output, including cable makers); the figures differ in scope. Foil: ICSG gives 10 kt, less than PRODCOM output, so the model's foil capacity is a lower bound from output plus projects.

  • The register does not cover all the area's plants in the form or the capacity scope is wider than the form (e.g. all of the plant's products) – the register capacity is then not a lower bound.

7. Layer 3 – output by country and product

EU-27 product output follows from the demand and trade balance identity, increased by new event output and reduced by closure losses not taken over in the EU. The lower bound 0.2 · D prevents negative output in extreme trade draws (the shortfall reduces imports). Split into areas: the base share with a random walk from 2025 applies to EU output without events, and events are added directly to the area concerned; then projection onto capacity and company lower bounds, and a lack of free capacity in the EU means imports:

Pp,t = Dp,t − Mp,t + Xp,t + Rp,t, ΔP = Q+ − (1 − ψ) L, ΔM = −min(ϑ Q+; 0,5 M) + (1 − ψ) L, ΔX = Q+ − min(ϑ Q+; 0,5 M)
πa,f,t = πa,f,2025 exp(Σk≤t σf ζa,k) / Σa' πa',f,2025 exp(Σk≤t σf ζa',k)
Pa,f,t = πa,f,t Pf,tno events + Qa,f,t − La,f,t + Za,f,t + ψ Lf,t πa,f,t(excl. closing), Pa,f,t ≤ umax Ca,f,t

Za,f,t – relocations (zero sum). The surplus above capacity goes to areas with free capacity in proportion to their output. Company lower bounds (the area's share of the EU sum of forms not below that of the reporting year) are applied in the model and again in the published draws, at the expense of other areas: Spain – wire rod, wire ≥ 5.5% (company reports 2024); Spain – wire rod, wire, bars and profiles, rolled sheet and strip, tubes ≥ 6.9% (company reports 2024); Greece – tubes ≥ 20.9% (ElvalHalcor report 2025); Greece – bars and profiles, tubes ≥ 6.0% (ElvalHalcor report 2025). Spanish wire rod drawn into wire within the same company (La Farga, Cunext) is outside PRODCOM sold output and goes to the “other” item. Polish wire rod = KGHM Polska Miedź S.A. data. Coherence in every draw: EU-27 = Σ areas, aggregates = Σ products; wire rod outside the sum.

Check: the largest share of published draws with a share below a company lower bound – 0.00%.

8. 2026 nowcast

2026 is conditioned on the STS production index NACE 24.44 (January–August 2026 vs January–August 2025: +0.7%): countries with an index – ensemble Kalman filter in logs; rest of the EU – importance weighting and systematic resampling (30,000 proposals, ESS 27,603). The 2026 prior was widened by c₀ = 1.34 – the conformal multiplier of hybrid model errors at a 1-year horizon in the backtest. The index covers the whole NACE 24.44 activity (including wire rod and refining) and only some countries, and the semis nowcast median combines it with the model prior – hence the semis nowcast change differs from the index change.

9. Backtest and model ensemble

As-of backtest: origins 2015, 2017, 2019 and 2021, horizon 1–5 years, 12 EU-27 series. The backtest hybrid model (HYBRID) uses only data to the origin (sector, demand and trade regressions; drivers – historical averages, as origin-year IMF and EC forecasts are not archived), without national capacity and events. The HYBRID-R diagnostic plugs in realised sector indices and is not in the ensemble. Ensemble: mean of log medians of members with equal weights (DRIFT excluded as it reduced accuracy).

Table 19. Mean backtest MAPE (12 EU-27 series, 4 origins)
Model All h = 1 h = 2 h = 3 h = 4 h = 5
Ensemble v2.0 (with the hybrid model) 8.9% 5.7% 8.3% 10.6% 9.6% 10.8%
Ensemble v1.3 (with the v1.3 bottom-up model) 9.0% 5.6% 8.3% 10.5% 9.7% 11.2%
Random walk 8.5% 4.9% 8.3% 10.5% 8.6% 11.0%
Hybrid model (data to origin) 9.1% 7.5% 7.9% 10.5% 9.5% 10.4%
Hybrid model with realised sectors (diagnostic) 8.3% 6.0% 8.4% 8.8% 8.9% 9.6%
v1.3 bottom-up model 9.2% 7.2% 7.4% 9.9% 10.0% 12.1%
ETS 9.7%
ARIMA(1,1,0) 10.1%
BSTS 10.1%
Random walk with drift 10.3%

ETS, ARIMA and BSTS values come from the same backtest records as the others (the backtest block of the forecast file).

In the backtest (4 origins 2015–2021, horizon 1–5 years) the model ensemble is not more accurate than the random walk: mean MAPE 8.9% vs 8.5% (v1.3 ensemble on the same data – 9.0%). The hybrid model alone has a MAPE of 9.1%, and 8.3% with sector indices known in advance: most of the error comes from annual use and trade shocks, not from the business-cycle forecast. The forecast is therefore mainly about the level, structure and range of uncertainty and the effects of scenarios, rather than an edge over simple extrapolation.

Table 20. MAPE by series (%)
Series Ensemble v2.0 Hybrid Bottom-up v1.3 Naive
Copper and copper-alloy semis – total (IWCC) 5.2 5.4 4.8 5.4
Copper-alloy semis – total 10.1 9.7 9.3 9.8
Alloy rods, bars and sections 8.3 8.2 7.4 9.0
Alloy plate, sheet and strip 17.9 15.4 17.6 15.4
Alloy tubes 6.6 8.2 7.2 9.5
Copper-alloy wire 16.6 20.8 18.7 16.8
Copper semis – total 6.2 4.6 6.2 4.9
Copper rods, bars and sections 8.7 8.2 9.7 7.4
Copper plate, sheet and strip (incl. foil) 6.8 7.7 7.4 7.5
Copper tubes 6.7 8.9 6.9 6.8
Copper wire (all drawn wire, incl. cable makers) 8.2 6.3 8.4 5.5
Copper wire rod (intermediate for wire drawing; outside the semis total) 5.3 5.6 6.4 4.6

The ensemble sets the EU-27 product level in 2027–2031 (top-down correction: a year multiplier common to the product's draws and areas); the hybrid model contributes structure and spread.

ln P̂p,tZ = (1/J) Σj ln P̂p,t(j), kp,t = P̂p,tZ / median(Pp,tH), Pa,p,t ← kp,t Pa,p,t

10. Conformal calibration of the final distribution

For each series (products and the aggregates: semis total, copper, alloys) the multiplier c of the hybrid model spread sd0 was set on ensemble backtest errors (80% and 90%) with an out-of-sample coverage condition and an origin-level lower bound (maximum over origins of the root mean square standardised error); c ∈ [0.5; 2.5]. LOO coverage is computed without leakage: the multiplier and the lower bound are set without the given origin. Published spread: the change from 2026 has standard deviation Tp,t = cp · sd0;p,t (non-decreasing over time) for products and aggregates simultaneously – components independent across products, common to the group (copper, alloys) and common to the semis total are set iteratively. The FINAL distribution is calibrated: after projection onto capacity and company lower bounds the standard deviation is checked and, if it falls below 0.97 of the target, the target is raised and the whole step repeated (up to 4 times).

Ei = (yi − mi) / (qihi − mi) for y ≥ m, (mi − yi) / (mi − qilo) for y < m; cα = E(⌈(n+1)(1−α)⌉)
ln X̃p,t = ap + mp,t + λp,t dp,t + sp,t kp + sg(p),t kg + stot,t ktot, sd(ln X̃p,t) = Tp,t
Table 21. Conformal multipliers, LOO coverage (no leakage) and final-to-target spread ratio (2031)
Series c c (sample) c (origins) LOO coverage 80% LOO coverage 90% final sd / target
Copper and copper-alloy semis – total (IWCC) 1.30 1.07 1.30 95% 95% 1.04
Copper-alloy semis – total 1.84 1.48 1.84 84% 89% 0.98
Alloy rods, bars and sections 1.58 1.47 1.58 84% 89% 1.00
Alloy plate, sheet and strip 1.48 1.48 1.35 89% 89% 0.99
Alloy tubes 0.53 0.51 0.53 95% 95% 1.87
Copper-alloy wire 0.70 0.57 0.70 89% 100% 1.20
Copper semis – total 1.27 1.27 1.22 89% 100% 0.99
Copper rods, bars and sections 1.06 1.01 1.06 89% 95% 1.00
Copper plate, sheet and strip (incl. foil) 0.75 0.71 0.75 84% 100% 0.99
Copper tubes 1.99 1.99 1.60 84% 84% 1.00
Copper wire (all drawn wire, incl. cable makers) 1.22 1.19 1.22 95% 100% 0.99
Copper wire rod (intermediate for wire drawing; outside the semis total) 1.02 0.80 1.02 89% 95% 1.00

The final-to-target spread ratio in 2027–2031 lies in 0.976–1.866. Above target are: total semis in 2027–2028 (1.118 and 1.091), alloy tubes (1.26–1.87) and alloy wire (up to 1.20); the intervals there are wider than the target, because the common group and total components needed for the alloy aggregate exceed the target of products with a small c. The intervals of these series are therefore conservative (not narrowed). LOO 90% coverage is below nominal in 4 series (copper tubes, total alloys, alloy bars and alloy sheet); with 19 points from 4 correlated origins, a result of 16/19 at probability 0.9 has P(≤ 16) ≈ 0.30, so it does not indicate narrowed intervals.

11. Cu content and copper balance check

Cu content: product mass × Cu share (copper semis 0.99–1.00, wire rod 0.999–1.0, alloys 0.622–0.72), drawn in every draw. The balance without double counting covers first-processing products: wire rod, copper semis excluding wire (wire is drawn from rod) and alloy semis. The balance is a CHECK: output is not adjusted, because the ceilings on cathode imports and direct-melt scrap are assumptions rather than a physical limit; the share of draws in which Cu in products exceeds metal availability is reported, together with the headroom:

MtCu = Cu(wire rod) + Cu(copper semis − wire) + Cu(alloy semis), At = RtR01 + Nt7403 + Stdm
N7403 = max2012–2025 N · (1 + U(0; 0.2)), Sdm = max2012–2025 DM · (1 + U(0; 0.1)) + q · NX7404 · κCu, q ~ U(0; 0.5), κCu ~ U(0.70; 0.95)

Components: maximum net cathode imports (CN 7403 11) 2012–2025 – 729 kt (2025: 541); maximum direct-melt scrap – 984 kt Cu; net scrap exports CN 7404 2023–2025 – 151 kt (mass). R01 – a draw from the R01 forecast distribution (version 1.2) by quantile interpolation, one u per draw, independent of R02 draws.

Table 22. EU-27 copper balance check (kt Cu)
Year Cu in products (p50) Availability A (p50) of which R01 (p50) Headroom p50 Headroom p10 Headroom p5 Exceeded, % of draws
2026 3,841 4,295 2,429 454.0 207.6 141.8 0.8
2027 3,850 4,439 2,571 591.6 203.2 79.9 2.9
2028 3,859 4,430 2,563 569.1 95.5 −53.1 6.4
2029 3,862 4,439 2,571 573.3 37.2 −135.6 8.6
2030 3,864 4,427 2,558 555.4 −45.0 −233.7 11.5
2031 3,888 4,405 2,536 517.1 −143.7 −361.6 15.3

In 2031 Cu in products exceeds the assumed metal availability in 15.3% of draws – in the upper tail of the output distribution combined with low draws of EU refined copper output. The median headroom is positive, but the p10 headroom is negative from 2030 and the p5 headroom from 2028. Refined copper use by semis producers (R02) exceeds EU-27 output (R01) – the gap is covered by net cathode imports; the link block shows this relation as a check, not a sum.

12. Probabilistic scenarios

The base scenario is the full Monte Carlo distribution. Named scenarios shift hybrid model parameters on the same random numbers; the ratio of the scenario result to the base result in a given draw (area × product; a 0.5 kt offset in the numerator and denominator guards against division by very small values) multiplies the calibrated published draw, after which the scenario capacity and company lower bounds are applied; the copper balance – as a check.

Xi,a,p,tsc = Xi,a,p,t · (Hi,a,p,tsc + 0.5) / (Hi,a,p,t + 0.5)
Table 23. Scenarios: 2031 results (kt; median, 80% interval) and parameters
Scenario Semis total Wire rod Parameters
Base (Monte Carlo) 3,946 (3,293–4,706) 2,342 (2,019–2,718) Monte Carlo distribution
Accelerated grid build-out 4,054 (3,380–4,816) 2,434 (2,092–2,839) Energy index growth 2027–2031 (top tercile 2011–2025): 4.29%/yr; Shift relative to the base path (average): 3.94 pp/yr
Extra-EU import surge 3,934 (3,285–4,693) 2,264 (1,940–2,640) Upper bound of the share of new non-EU plant output (Tangier, CRW) in the EU or in displaced EU exports: 50%; Share of Morocco, Tunisia and Serbia in EU wire rod exports (2023–2025): 46.7%
Closures under high energy costs 3,820 (3,182–4,545) 2,276 (1,953–2,651) Threshold: 2025 EU-27 average price (non-household consumers, 2–20 GWh a year): 19.45 ct/kWh; Countries above the threshold: AT, BE, CY, CZ, DE, DK, HU, IE, IT, NL, PL, RO, SK; Share of form output closed (2027 / from 2029), × energy intensity: 10% / 15%; Form energy intensity (assumption): bars, tubes, sheet, foil / wire rod / wire: 1.0 / 0.5 / 0.2; Other EU countries: output share of countries above the threshold (PRODCOM 2021–2024): 79.9%
Construction recession 3,737 (3,104–4,488) 2,241 (1,930–2,594) Worst 3-year change of construction output (period 2008–2010): −14.1%; Construction shift in 2027–2029 relative to the base path (average): −5.24 pp/yr; Transmission to industry: C28 elasticity to F × C28 weight in industry: 1.7 × 0.35
  • Accelerated grid build-out – Energy and grid demand grows over the whole horizon at the top-tercile rate of 2011–2025 (Eurostat production indicators C271, C2732, F42) – a historical parameter. The direction is consistent with the EU Action Plan for Grids COM(2023) 757 (EUR 584 billion of grid investment this decade); the plan's scale was not converted into semis demand.
  • Extra-EU import surge – New capacity just outside the EU: the Hailiang plant in Tangier (tubes, rods, foil; the company document points to the European market) supplies part of its output to the EU, and the new CRW Metal rod mill in Türkiye (per the company – for the Turkish market) displaces part of EU wire rod exports to Morocco, Tunisia and Serbia. The share χ is an upper bound – an assumption.
  • Closures under high energy costs – Stress test: in countries with an industrial electricity price above the 2025 EU-27 average (Eurostat nrg_pc_205), 10% of form output closes from 2027 and 15% in total from 2029, weighted by the form's energy intensity; part of the output is taken over by other EU plants, the rest by imports.
  • Construction recession – In 2027–2029 construction output repeats the worst three-year period of 2001–2025 (Eurostat, construction F: 2008–2010), with transmission to industry (fittings, heat pumps, air conditioning – C28); from 2030 – the base path.
Table 24. Scenario sensitivity to β (hybrid model; change of the 2031 median against the base, kt)
Scenario Series β – bootstrap distribution β excluding 2020–2021
Accelerated grid build-out Copper and copper-alloy semis – total (IWCC) 115.1 29.1
Accelerated grid build-out Copper wire rod (intermediate for wire drawing; outside the semis total) 92.7 21.0
Construction recession Copper and copper-alloy semis – total (IWCC) −215.7 −48.2
Construction recession Copper wire rod (intermediate for wire drawing; outside the semis total) −100.1 −28.0

The effects of scenarios acting through sector demand are proportional to β – with β from the sample excluding 2020–2021 they are several times smaller.

13. Results and comparison with version 1.3

Table 25. Results (kt product mass): 2025, 2026 nowcast, 2031 forecast (median, 80% interval) and version 1.3
Area Series 2025 2026 2031 2031 v1.3
EU-27 Copper and copper-alloy semis – total (IWCC) 3,886 3,908 3,946 (3,293–4,706) 3,952
Germany Copper and copper-alloy semis – total (IWCC) 826 841 812 (636–1,043) 835
Spain Copper and copper-alloy semis – total (IWCC) 202 204 204 (161–240) 205
Finland Copper and copper-alloy semis – total (IWCC) 70 69 67 (47–87) 71
France Copper and copper-alloy semis – total (IWCC) 91 84 74 (43–112) 90
Greece Copper and copper-alloy semis – total (IWCC) 81 80 87 (67–112) 77
Italy Copper and copper-alloy semis – total (IWCC) 732 737 749 (579–957) 735
Poland Copper and copper-alloy semis – total (IWCC) 49 48 56 (40–75) 49
Sweden Copper and copper-alloy semis – total (IWCC) 15 15 16 (11–36) 15
Other EU countries and unallocated output Copper and copper-alloy semis – total (IWCC) 1,820 1,823 1,867 (1,507–2,259) 1,834
EU-27 Copper semis – total 2,652 2,654 2,670 (2,193–3,202) 2,697
EU-27 Copper-alloy semis – total 1,234 1,250 1,248 (893–1,746) 1,229
EU-27 Copper wire (all drawn wire, incl. cable makers) 1,954 1,964 1,980 (1,583–2,408) 1,986
EU-27 Copper rods, bars and sections 150 146 149 (114–195) 160
EU-27 Copper plate, sheet and strip (incl. foil) 298 296 289 (219–382) 300
EU-27 Copper tubes 249 245 235 (160–346) 232
EU-27 Copper-alloy wire 35 36 34 (21–56) 31
EU-27 Alloy rods, bars and sections 825 835 828 (597–1,159) 801
EU-27 Alloy plate, sheet and strip 310 312 307 (183–515) 314
EU-27 Alloy tubes 64 64 62 (44–86) 61
EU-27 Copper wire rod (intermediate for wire drawing; outside the semis total) 2,282 2,314 2,342 (2,019–2,718) 2,337
Germany Copper wire rod (intermediate for wire drawing; outside the semis total) 647 659 641 (483–780) 650
Spain Copper wire rod (intermediate for wire drawing; outside the semis total) 224 235 254 (199–330) 224
Finland Copper wire rod (intermediate for wire drawing; outside the semis total) 1 1 1 (1–2) 1
Italy Copper wire rod (intermediate for wire drawing; outside the semis total) 416 415 411 (300–505) 418
Poland Copper wire rod (intermediate for wire drawing; outside the semis total) 262 262 264 (186–326) 262
Sweden Copper wire rod (intermediate for wire drawing; outside the semis total) 125 126 130 (88–186) 124
Other EU countries and unallocated output Copper wire rod (intermediate for wire drawing; outside the semis total) 607 611 655 (483–841) 610

Largest differences of 2031 medians against version 1.3: Other EU countries and unallocated output – wire rod 45 kt; Other EU countries and unallocated output – semis total 34 kt; Spain – wire rod 30 kt; Germany – semis total −23 kt. They follow from the plant module (SK Nexilis foil with a lower probability, the Rai relocation, the Lens increase), exports to the USA after the tariff and the new construction indicators.

Percentiles (including medians) do not add up across areas and products; draws and means do.

14. Sensitivity and variance shares

Table 26. Tornado: change of the 2031 median (kt; hybrid model, same draws)
Series Driver Low High
Copper and copper-alloy semis – total (IWCC) Sector demand: construction (±1 pp growth a year) −40.5 40.2
Copper wire rod (intermediate for wire drawing; outside the semis total) Sector demand: construction (±1 pp growth a year) −27.2 25.1
Copper and copper-alloy semis – total (IWCC) Sector demand: energy and grids (±1 pp growth a year) −34.0 35.9
Copper wire rod (intermediate for wire drawing; outside the semis total) Sector demand: energy and grids (±1 pp growth a year) −28.0 27.1
Copper and copper-alloy semis – total (IWCC) Sector demand: industry (±1 pp growth a year) −69.7 70.8
Copper wire rod (intermediate for wire drawing; outside the semis total) Sector demand: industry (±1 pp growth a year) −22.1 22.1
Copper and copper-alloy semis – total (IWCC) Sector demand: transport (±1 pp growth a year) −26.4 26.2
Copper wire rod (intermediate for wire drawing; outside the semis total) Sector demand: transport (±1 pp growth a year) −16.6 16.4
Copper and copper-alloy semis – total (IWCC) Extra-EU import penetration (±2% a year) −31.9 28.7
Copper wire rod (intermediate for wire drawing; outside the semis total) Extra-EU import penetration (±2% a year) −10.5 9.2
Copper and copper-alloy semis – total (IWCC) Extra-EU exports (trend ±1 pp a year) −21.2 22.3
Copper wire rod (intermediate for wire drawing; outside the semis total) Extra-EU exports (trend ±1 pp a year) −19.5 22.0
Table 27. Shares of 2031 log variance (Shapley R²)
Series Factor Share
Copper and copper-alloy semis – total (IWCC) EU semis demand (sectors and product shocks) 32.3%
Copper and copper-alloy semis – total (IWCC) Foreign trade (net exports in 2031) 3.9%
Copper and copper-alloy semis – total (IWCC) Capacity limits (output cut in 2031) 0.7%
Copper and copper-alloy semis – total (IWCC) Other (product shocks, country shares, model ensemble, conformal calibration) 63.0%
Copper wire rod (intermediate for wire drawing; outside the semis total) EU semis demand (sectors and product shocks) 78.4%
Copper wire rod (intermediate for wire drawing; outside the semis total) Foreign trade (net exports in 2031) 5.7%
Copper wire rod (intermediate for wire drawing; outside the semis total) Capacity limits (output cut in 2031) 0.9%
Copper wire rod (intermediate for wire drawing; outside the semis total) Other (product shocks, country shares, model ensemble, conformal calibration) 15.0%

15. Limitations

  • The 2027–2031 EU-27 level is set by an equal-weight ensemble of five models; the hybrid model (weight 1/5) gives the structure, intervals and scenarios. Plant events (projects, closures) act mainly on the split between countries.
  • Hybrid model factors explain about 37% of the variance of the 2031 semis total (wire rod – about 85%); the rest is annual product shocks, country shares, the model ensemble and interval calibration – scenarios move the median less than the interval width.
  • The demand elasticity to sectors is identified mainly by 2020–2021 (β = 0.9; without those years 0.3); β and η uncertainty comes from a block bootstrap of years and is carried into the draws, but the grid and recession scenario results depend on β (variant in the note).
  • The copper end-use structure (IWCC End Use Summary) is global and is applied to the EU unchanged; the allocation of end uses to 4 sectors and the sector × product matrix are assumptions (class C) with sampled uncertainty. The construction share in tubes and brass in the EU is probably higher than in the global structure.
  • Capacity is documented for only part of the plants; the rest – a lower bound from 2021–2025 output and an assumed utilisation. The “about 270 kt” figure for the Orsk rod mill is an output level in the company report, not capacity. Wire drawn at cable makers has no independent capacity measure.
  • Including electrodeposited foil (CN 7410) in the IWCC product “Copper Plate, Sheet & Strip (Inc. Foil)” is an assumption (class C) – IWCC lists heading 7410 only in a general code list; foil is a separate sub-form in the plant module, and its share of the product is taken from PRODCOM 2025 (constant apart from projects). Without EU foil projects, total semis in 2031 would be lower by about 26 kt (about 0.65%).
  • Project probabilities and delays are assumptions by status; many projects in company documents do not state a capacity increase and have no quantitative term (e.g. the new Contirod and Upcast II lines at the KGHM plant in Orsk).
  • Trade: the CN 7407–7411 → IWCC product key is explicit, and the IWCC–Comext reconciliation residual is modelled statistically; exports to the USA after the 50% tariff are a permanent level reduction from 2026 data, without diversion of other exporters' supplies to the EU market.
  • The copper balance is a check (output not adjusted): the R01 distribution is drawn independently of R02, and the ceilings on cathode imports and direct-melt scrap are assumptions. The p10 metal headroom is negative from 2030 and the p5 headroom from 2028 (upper output tail with low refined copper output).
  • The “other EU countries and unallocated output” item is about 47% of 2025 semis: mainly wire drawn at cable makers, wire rod in Belgium, France and Greece and Spanish wire rod drawn into wire within the same company (La Farga, Cunext – outside PRODCOM sold output), countries without data.
  • GDP and investment forecast uncertainty is taken from historical volatility (class C), as IMF and EC forecast error statistics are not in the forecast data; the recession scenario parameter comes from 2008–2010 (construction output F).
  • The backtest covers the simplified hybrid model (without capacity, events and the sampled matrix); a backtest of the full hybrid and the sensitivity of conformal multipliers to the origin set – in version 2.1. No archived vintages of IWCC, Comext and IMF/EC forecasts. The intervals of total semis in 2027–2028 and of alloy tubes and alloy wire are wider than the calibration target (up to 1.9 times), because the common group and total components exceed the target of products with a small conformal multiplier.
  • The copper price, conversion margins, aluminium substitution (cables, windings, heat exchangers), copper intensity of electric vehicles and data-centre demand are not separate model variables (they act only through historical trends).

16. Reproducibility

Deterministic run (seed 20261013; Python 3.12.10, numpy 2.4.2, pandas 3.0.1): data download and preparation, model, publication and check scripts in the forecast repository; the same code and data give an identical result file. R01 forecast in the balance check: version 1.2 (MD5 307d328c43d6…).

Methodological bibliography

  • Angelopoulos A.N., Bates S. (2023). Conformal prediction: a gentle introduction. Foundations and Trends in ML 16(4), 494–591.
  • DerSimonian R., Laird N. (1986). Meta-analysis in clinical trials. Controlled Clinical Trials 7(3), 177–188.
  • Evensen G. (2003). The Ensemble Kalman Filter: theoretical formulation and practical implementation. Ocean Dynamics 53, 343–367.
  • Glasserman P. (2004). Monte Carlo Methods in Financial Engineering. Springer (common random numbers).
  • Hyndman R.J., Athanasopoulos G. (2021). Forecasting: Principles and Practice, 3rd ed. OTexts.
  • Künsch H.R. (1989). The jackknife and the bootstrap for general stationary observations. Annals of Statistics 17(3), 1217–1241.
  • Smith J., Wallis K.F. (2009). A simple explanation of the forecast combination puzzle. Oxford Bulletin of Economics and Statistics 71(3), 331–355.
  • Vovk V., Gammerman A., Shafer G. (2005). Algorithmic Learning in a Random World. Springer.

← Forecast: Copper semi-finished products output in the EU 2026–2031 · Portal method →

↑ Back to top