Kombinat aluminijuma Podgorica (KAP)
closed- Capacity
- 120 kt/yrnominalna
- Status
- electrolysis closed in 2023 (last 12 cells; 170 cells since 2021); ingot and alloy casthouse runs on imported metal
The last twelve pots were shut down in May 2023, ending 52 years of primary aluminium production in Montenegro. The plant retained an ingot and silumin alloy foundry, working on imported metal – the reverse of the combine’s original concept, based on local bauxite.
Verified at source: