Mielec – starter battery production
operating- Status
- operating
Products: Lead-acid starter batteries
The 21,000 m² factory makes starter, deep-cycle and AGM batteries; the EEA installation list for 2024 shows a “battery production” installation in Mielec.
Verified at source: